Do you have any question about this error?
Message type: E = Error
Message class: RI - Projects: commercial reporting
Message number: 014
Message text: Activity & is not an account assignment object -> reset
You cannot make direct assignments to the network specified. You are
not allowed to enter a network activity.
Delete the activity number you have entered.
Error message extract from SAP system. Copyright SAP SE.
RI014
- Activity & is not an account assignment object -> reset ?The SAP error message RI014 indicates that there is an issue with the account assignment object in a transaction. Specifically, it means that the system is unable to recognize the specified activity as a valid account assignment object. This can occur in various contexts, such as when trying to post a transaction that requires a valid account assignment.
Cause:
- Invalid Activity Code: The activity code you are trying to use may not be defined in the system or may not be assigned to the relevant cost center or internal order.
- Missing Configuration: The configuration for the activity type may not be set up correctly in the controlling area.
- Incorrect Master Data: The master data for the cost center, internal order, or activity type may be incomplete or incorrect.
- Authorization Issues: The user may not have the necessary authorizations to access the specified account assignment object.
Solution:
- Check Activity Code: Verify that the activity code you are using is valid and exists in the system. You can do this by checking the configuration in the SAP system.
- Review Configuration: Ensure that the activity type is properly configured in the controlling area. This includes checking the assignment of the activity type to the relevant cost centers or internal orders.
- Validate Master Data: Check the master data for the cost center or internal order to ensure that it is complete and correctly set up. This includes verifying that the activity type is assigned to the cost center or internal order.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the transaction involving the specified account assignment object.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the configuration and setup of account assignment objects.
Related Information:
KS01
(Create Cost Center), KSU1
(Create Activity Type), or KSB1
(Display Actual Line Items) to check and manage the relevant data.If you continue to experience issues after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) or financial accounting (FI) within SAP.
Get instant SAP help. Start your 7-day free trial now.
RI013
Activity & does not exist
What causes this issue? Activity &V1& does not exist in network &V2&.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJE...
RI012
Network & does not exist
What causes this issue? Network &V1& does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix t...
RI015
Only one entry permitted in a project, WBS element, order, or network
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RI016
Entry required for project, WBS element, order, or network
What causes this issue? An entry is required.How to fix this error? Enter one of the following objects: Project, WBS element, order, or network. On...
Click on this link to search all SAP messages.