How To Fix RESCSH007 - No vacancy cost center entered for &1 and period &2


RESCSH007 - Overview

  • Message type: E = Error

  • Message class: RESCSH - Error Messages When Creating Settlement Hierarchy

  • Message number: 007

  • Message text: No vacancy cost center entered for &1 and period &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RESCSH007 - No vacancy cost center entered for &1 and period &2 ?
    The SAP error message RESCSH007 indicates that there is no vacancy cost center entered for a specific object (represented by &1) and period (represented by &2). This error typically occurs in the context of SAP's Controlling (CO) module, particularly when dealing with cost center accounting and vacancy management.
    
    Cause: Missing Configuration: The most common cause of this error is that the system does not have a defined vacancy cost center for the specified object and period. This can happen if the cost center has not been properly set up in the system. Incorrect Period: The period specified may not have a corresponding vacancy cost center defined. Data Entry Error: There may be a mistake in the data entry where the cost center or period is incorrectly specified.
    Solution: Check Configuration: Navigate to the configuration settings for vacancy management in SAP. Ensure that a vacancy cost center is defined for the relevant object and period. This can typically be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker