Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: RESCHS - Data exchange
Message number: 007
Message text: Assignment of measurement type to basic component is missing
In order to be able to create the M/L-tape, a measurement type has to be
assigned to a basic component.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RESCHS007
- Assignment of measurement type to basic component is missing ?The SAP error message RESCHS007 indicates that there is a missing assignment of a measurement type to a basic component in the context of resource scheduling or capacity planning. This error typically arises in the SAP system when trying to perform operations related to resource scheduling, such as creating or modifying a scheduling object.
Cause:
The error occurs due to one of the following reasons:
- Missing Configuration: The measurement type that is required for the basic component has not been defined in the system.
- Incorrect Assignment: The measurement type may not be correctly assigned to the basic component in the configuration settings.
- Data Inconsistency: There may be inconsistencies in the master data or configuration settings related to the resource or component.
Solution:
To resolve the RESCHS007 error, you can follow these steps:
Check Measurement Type Assignment:
- Go to the configuration settings in SAP (Transaction code: SPRO).
- Navigate to the relevant area for resource scheduling or capacity planning.
- Check the assignment of measurement types to basic components. Ensure that the required measurement type is assigned to the basic component you are working with.
Define Measurement Types:
- If the measurement type is missing, you may need to define it. This can typically be done in the configuration settings under the relevant module (e.g., Production Planning, Project System).
- Ensure that the measurement type is correctly set up with all necessary parameters.
Review Master Data:
- Check the master data for the basic component to ensure that all required fields are filled out correctly.
- Look for any inconsistencies or missing information that could lead to this error.
Testing:
- After making the necessary changes, test the process again to see if the error persists.
- If the error is resolved, document the changes made for future reference.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed guidance on configuring measurement types and basic components.
Seek Help from SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support or consulting with an SAP expert who can provide more specific assistance based on your system configuration.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the RESCHS007 error in your SAP system.
Get instant SAP help. Sign up for our Free Essentials Plan.
RESCHS006
Cost element &2 of company &1 not assigned to cost group
What causes this issue? Cost elements are entered in the system for settlement company &V1&, but cost element &V2& is not assigned to...
RESCHS005
No assignment of external cost elements to SCK for company &1
What causes this issue? You can enter the cost elements for each external settlement company in the system. If the indicator for clearing of advance ...
RESCHS008
Various basic components have the same measurement type
What causes this issue? The M/L tape allows three different basic components to be transferred to the external settlement company. However, you have ...
RESCHS009
Deleting evaluation group for &1 is not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.