Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 310
Message text: Scheduling error: &
A problem occurred when determining the column in which the planned
order is to be created.
This problem can probably only be solved by SAP development.
Error message extract from SAP system. Copyright SAP SE.
REMPT310
- Scheduling error: & ?The SAP error message REMPT310, which indicates a "Scheduling error," typically arises in the context of production planning and scheduling within the SAP system. This error can occur for various reasons, and understanding the cause is essential for finding an appropriate solution.
Possible Causes:
- Capacity Constraints: The scheduling error may occur if there are insufficient resources (e.g., machines, labor) available to meet the production requirements.
- Incorrect Master Data: Issues with master data, such as incorrect routing, work center settings, or production versions, can lead to scheduling errors.
- Material Availability: If the required materials are not available or are not properly planned, it can cause scheduling issues.
- Scheduling Parameters: Incorrect settings in the scheduling parameters (like lead times, processing times, etc.) can lead to conflicts during the scheduling process.
- Overlapping Orders: If there are overlapping production orders that cannot be scheduled simultaneously due to resource constraints, this error may occur.
- Date Constraints: If the planned start or finish dates of the production orders are not feasible, it can trigger this error.
Solutions:
- Check Capacity Planning: Review the capacity of work centers and ensure that there are enough resources available for the planned production.
- Review Master Data: Verify the correctness of the routing, work center, and production version settings. Ensure that all necessary data is correctly maintained.
- Material Availability Check: Ensure that all required materials are available and properly planned in the system. Use transaction codes like MD04 to check stock levels.
- Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the production order or in the configuration settings to ensure they are set correctly.
- Resolve Overlapping Orders: Check for any overlapping production orders and adjust their scheduling to avoid conflicts.
- Re-schedule Orders: If necessary, try to re-schedule the production orders after making the required adjustments to the master data or capacity.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
REMPT304
No capactiy planning active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT303
No capa. data determined: Plant &1 / Ord. type &2 / Prod. sched. &3
What causes this issue? No capacity planning is allowed for the selected scheduling level for plant &V1&, planned order type &V2& and...
REMPT311
Problems occurred when scheduling plnd ord. for mat. &1, version &2
What causes this issue? Problems occurred when scheduling the planned order. This may be due to one of the following reasons, for example: The schedu...
REMPT312
Scheduling not executed for plnd orders of material &1, version &2
What causes this issue? The planned order was not scheduled. This may be due to one of the following reasons, for example: The scheduling level (deta...
Click on this link to search all SAP messages.