Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 251
Message text: The dispatching period has been set to &1 days (=&2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
REMPT251
- The dispatching period has been set to &1 days (=&2) ?The SAP error message REMPT251 indicates that there is an issue with the dispatching period set for a particular process or operation in the SAP system. This error typically arises in the context of SAP's Advanced Planning and Optimization (APO) or similar modules where planning and scheduling are involved.
Cause: The error message "The dispatching period has been set to &1 days (=&2)" suggests that the dispatching period configured in the system is either too long or not aligned with the expected settings for the operation being performed. The parameters &1 and &2 represent the values that are causing the issue, where &1 is the configured dispatching period and &2 is the expected or required dispatching period. Possible Causes:
Configuration Issues: The dispatching period may have been set incorrectly in the configuration settings of the planning area or the relevant master data. Master Data Settings: The settings in the master data (like product, location, or
Get instant SAP help. Sign up for our Free Essentials Plan.
REMPT250
Date &1 is not valid. Enter a new date.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT249
Invalid date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
REMPT260
Expanding and collapsing periods not possible for planning calendar
What causes this issue? You want to expand or collapse a period of the planning calendar.System Response Expanding and collapsing periods is not pos...
REMPT261
In lead time scheduling, shift is not contained in period split
What causes this issue? You want to convert individual days to shifts. Due to technical reasons, this is not possible for lead time scheduling (detai...
Click on this link to search all SAP messages.