How To Fix REAJBD119 - Object &1 is not assigned to partial cost-efficiency analysis &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: REAJBD - Messages for Adjustment Basic Data

  • Message number: 119

  • Message text: Object &1 is not assigned to partial cost-efficiency analysis &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message REAJBD119 - Object &1 is not assigned to partial cost-efficiency analysis &2 ?
    The SAP error message REAJBD119 indicates that a specific object (such as a cost center, internal order, or project) is not assigned to a partial cost-efficiency analysis. This error typically arises in the context of controlling and cost accounting within SAP, particularly when dealing with cost analysis and reporting.
    
    Cause: The error occurs when you attempt to perform an operation (like running a report or executing a transaction) that requires the specified object to be linked to a particular partial cost-efficiency analysis, but it is not. This can happen due to several reasons: Missing Assignment: The object has not been assigned to the relevant cost-efficiency analysis in the configuration settings. Incorrect Configuration: The configuration for the partial cost-efficiency analysis may not be set up correctly. Data Entry Error: There may be a mistake in the data entry where the object was not properly linked to the analysis.
    Solution: To resolve the REAJBD119 error, you can follow these

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker