How To Fix RE298 - End date &1 in performance period is before start date &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RE - Earmarked funds

  • Message number: 298

  • Message text: End date &1 in performance period is before start date &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RE298 - End date &1 in performance period is before start date &2 ?

    The SAP error message RE298 indicates that there is a problem with the date configuration in a performance period. Specifically, it means that the end date of a performance period is set before the start date, which is logically incorrect and prevents the system from processing the data correctly.

    Cause:

    The error is typically caused by one of the following issues:

    1. Incorrect Date Entry: The end date of the performance period was entered incorrectly, either manually or through a data import.
    2. System Configuration: There may be a configuration issue in the system that is causing the dates to be set incorrectly.
    3. Data Migration Issues: If data was migrated from another system, the date formats or values may not have been transferred correctly.

    Solution:

    To resolve the RE298 error, you can take the following steps:

    1. Check the Dates:

      • Navigate to the relevant performance period configuration in SAP.
      • Verify the start and end dates of the performance period.
      • Ensure that the end date is after the start date.
    2. Correct the Dates:

      • If you find that the end date is indeed before the start date, update the end date to a valid date that is after the start date.
    3. Review Configuration:

      • If the dates are set correctly but the error persists, review the configuration settings for performance periods in your SAP system to ensure there are no underlying issues.
    4. Data Migration Review:

      • If the error arose after a data migration, review the migration process to ensure that date formats and values were correctly handled.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on managing performance periods and date settings.
    6. Contact Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may need to use specific transaction codes related to performance management or configuration to access and modify the performance period settings.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on handling date-related errors.
    • User Permissions: Ensure that you have the necessary permissions to make changes to performance period settings in SAP.

    By following these steps, you should be able to resolve the RE298 error and ensure that your performance periods are configured correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant