Do you have any question about this error?
Message type: E = Error
Message class: RDPT - Messages for Redemption Schedules for Securities Class Data
Message number: 111
Message text: New drawing date &1 created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RDPT111
- New drawing date &1 created ?The SAP error message RDPT111, which states "New drawing date &1 created," typically occurs in the context of project management or production planning within SAP. This message indicates that a new drawing date has been generated for a project or production order, which may not align with the expected schedule or may require further action.
Cause:
- Schedule Changes: The drawing date may have been updated due to changes in the project schedule, resource availability, or other planning factors.
- Data Entry Errors: Incorrect data entry during the planning process can lead to unexpected drawing dates.
- Configuration Issues: There may be configuration settings in the project management or production planning modules that are causing the system to generate new drawing dates automatically.
- Dependencies: Changes in dependent tasks or activities may trigger a new drawing date.
Solution:
- Review the Project Schedule: Check the project schedule and dependencies to understand why the drawing date was changed. Ensure that all tasks are aligned with the new date.
- Check for Data Entry Errors: Verify that all data entered into the system is correct and that there are no discrepancies that could lead to unexpected drawing dates.
- Adjust Configuration Settings: If the issue is related to system configuration, consult with your SAP administrator or a functional consultant to review and adjust the relevant settings.
- Communicate with Stakeholders: Inform relevant stakeholders about the new drawing date and ensure that everyone is aware of the changes and their implications.
- Use Transaction Codes: Utilize relevant transaction codes (like CJ20N for project management) to review and adjust project details as necessary.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with SAP support or a qualified SAP consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RDPT110
************** Messages for drawings (exercise rights)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RDPT106
ID number &1 is not an index-linked bond
What causes this issue? You wanted to value ID number &V1& as an index-linked bond. However, this bond is not an index-linked bond.System Res...
RDPT112
Program terminated while creating drawable bond
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RDPT113
Drawing date &2 already exists
What causes this issue? The new drawing date <(>&<)>v1<(>&<)> cannot be created because drawing date <(>&&l...
Click on this link to search all SAP messages.