Do you have any question about this error?
Message type: E = Error
Message class: RDPT - Messages for Redemption Schedules for Securities Class Data
Message number: 113
Message text: Drawing date &2 already exists
The new drawing date <(>&<)>v1<(>&<)> cannot be created because drawing
date <(>&<)>v2<(>&<)> already exists.
A repayment condition valid until <(>&<)>v1<(>&<)> has been created in
the drawn bond. However, a repayment condition valid until <(>&<)>v2<(>
&<)> already exists. This condition replaces all the previous
conditions. The cash flow of the drawn bond can no longer be calculated
correctly.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Delete all the drawings (rights) after &v1&. To do this, use report
ZSAP_RIGHT_DELETE from note 927114.
Change the class master data of the drawn bond <DS:TRAN.FWZZ>&v3& </>:
Delete all the repayment conditions after &v1&.
Error message extract from SAP system. Copyright SAP SE.
RDPT113
- Drawing date &2 already exists ?The SAP error message RDPT113, which states "Drawing date &2 already exists," typically occurs in the context of document management or project management within SAP, particularly when dealing with drawings or documents that have specific dates associated with them.
Cause:
The error indicates that there is an attempt to create or update a drawing or document with a date that already exists in the system. This can happen due to:
- Duplicate Entries: The system is trying to create a new entry with a drawing date that matches an existing entry.
- Data Integrity Rules: SAP enforces certain rules to maintain data integrity, and this error is a result of those rules being violated.
- Incorrect Data Entry: Users may inadvertently enter the same date for multiple drawings or documents.
Solution:
To resolve the RDPT113 error, you can take the following steps:
Check Existing Entries: Review the existing drawings or documents in the system to identify if there is already an entry with the same drawing date. You can do this by querying the relevant tables or using transaction codes related to document management.
Modify the Drawing Date: If you find that the drawing date is indeed a duplicate, consider changing the date for the new entry to a unique value that does not conflict with existing entries.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing drawing dates and related entries.
User Training: Ensure that users are trained on the importance of unique drawing dates and how to check for existing entries before creating new ones.
System Configuration: If this error occurs frequently and is causing issues, it may be worth reviewing the system configuration or business rules that govern drawing date entries to see if adjustments are needed.
Related Information:
CV01N
(Create Document), CV02N
(Change Document), or CV03N
(Display Document) to manage documents effectively.By following these steps, you should be able to address the RDPT113 error and ensure that your drawing dates are managed correctly within the SAP system.
Get instant SAP help. Start your 7-day free trial now.
RDPT112
Program terminated while creating drawable bond
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RDPT111
New drawing date &1 created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RDPT114
Save the data first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RDPT120
************** Messages for drawing factors *****************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.