Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: QST - Stability Study
Message number: 043
Message text: The testing schedule is incomplete
You want to complete the scheduling for a stability study using a
follow-up function in the notification.
This is not currently possible, as the associated testing schedule has
not been fully maintained.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Supplement the testing schedule for the stability study by adding a
task list (task list group, group counter) for each item of a task list
type. This task list is used to inspect the associated storage
conditions.
Error message extract from SAP system. Copyright SAP SE.
QST043
- The testing schedule is incomplete ?The SAP error message QST043, which states "The testing schedule is incomplete," typically occurs in the context of quality management (QM) processes, particularly when dealing with inspection lots and testing schedules. This error indicates that there are missing or incomplete entries in the testing schedule that need to be addressed before proceeding.
Cause:
- Incomplete Testing Schedule: The testing schedule may not have all the required tests defined for the inspection lot.
- Missing Specifications: There may be missing specifications or criteria that need to be defined for the tests.
- Incorrect Configuration: The configuration settings for the quality management module may not be set up correctly.
- Data Entry Errors: There may be errors in data entry or missing data in the relevant master records (e.g., material master, inspection plan).
Solution:
- Review the Testing Schedule: Check the testing schedule associated with the inspection lot to ensure that all required tests are defined and that there are no missing entries.
- Complete Missing Information: If any tests or specifications are missing, complete the necessary information in the testing schedule.
- Check Inspection Plan: Ensure that the inspection plan linked to the inspection lot is complete and correctly configured. This includes verifying that all required characteristics and methods are defined.
- Configuration Check: Review the configuration settings in the Quality Management module to ensure they are set up correctly.
- Data Validation: Validate the data in the material master and other related records to ensure that all necessary information is present and correct.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the testing schedule and quality management processes.
Related Information:
QA32
(for managing inspection lots) or QDP1
(for managing testing schedules) to access and modify the relevant data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant specializing in Quality Management for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
QST042
Maintenance plan category & does not have correct call object (insp. lot)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
QST041
The maintenance plan category & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
QST044
No testing schedule has been created for stability study &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
QST045
No initial sample found for stability study &
What causes this issue? Either no initial sample has been created for the stability study, or an internal error ocurred when the initial sample was b...
Click on this link to search all SAP messages.