Do you have any question about this error?
Message type: E = Error
Message class: QPCP - Control Plan
Message number: 090
Message text: Plan creation date must not be greater than selection date
The plan creation date must not be greater than the selection date.
You have selected a date as the valid-from date for plan creation that
is greater than the date that is used to select the control plan.
The plan cannot be created.
Enter a valid-from date for the plan you want to create that is smaller
than or equal to the selection date for the control plan, or change the
selection date in the basic data.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
QPCP090
- Plan creation date must not be greater than selection date ?The SAP error message QPCP090 indicates that there is an issue with the plan creation date in relation to the selection date during the planning process in SAP. This error typically occurs in the context of production planning or capacity planning when the system detects that the date you are trying to set for the plan is later than the date you are selecting for processing.
Cause:
The primary cause of this error is that the plan creation date you are trying to enter is greater than the selection date. This can happen due to:
- Incorrect Date Entry: The user may have mistakenly entered a future date for the plan creation.
- System Configuration: There may be settings in the system that enforce date constraints which are not being adhered to.
- Data Consistency Issues: There could be inconsistencies in the data that lead to this error, such as incorrect planning parameters or settings.
Solution:
To resolve the QPCP090 error, you can take the following steps:
Check Dates: Verify the plan creation date and the selection date. Ensure that the plan creation date is not set to a future date compared to the selection date.
Adjust Dates: If the plan creation date is indeed in the future, adjust it to a date that is equal to or earlier than the selection date.
Review Configuration: If you believe the dates are correct, review the configuration settings related to planning in your SAP system. Ensure that there are no constraints that are causing this issue.
Consult Documentation: Check SAP documentation or help resources for any specific guidelines related to planning dates in your version of SAP.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
MD01
(MRP Run), MD02
(Single-item, Multi-level Planning), or CM21
(Capacity Planning).By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
QPCP089
A control plan could not be created based on your entries
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
QPCP088
Inspection char. &1 from plan &2 links to a deleted FMEA characteristic
What causes this issue? The plan contains an inspection characteristic that was deleted from the FMEA.System Response The system issues an error mes...
QPCP099
---------------------- CP Customizing Error Messages -----------------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
QPCP100
There are no Customizing entries for the specified structure type &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.