How To Fix QPCP030 - Control plan is consistent


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QPCP - Control Plan

  • Message number: 030

  • Message text: Control plan is consistent

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message QPCP030 - Control plan is consistent ?

    The SAP error message QPCP030, which states "Control plan is consistent," typically indicates that the control plan you are trying to create or modify is already consistent and does not require any changes. This message is not necessarily an error but rather an informational message indicating that the control plan is in a valid state.

    Cause:

    1. No Changes Needed: The control plan you are working with has already been validated and is consistent with the requirements of the system.
    2. Duplicate Action: You may be attempting to perform an action that is unnecessary because the control plan is already in a consistent state.

    Solution:

    1. Review the Control Plan: Check the control plan to ensure that it meets your requirements. If you intended to make changes, verify that you are modifying the correct version or instance of the control plan.
    2. No Action Required: If the control plan is indeed consistent and meets your needs, no further action is required. You can proceed with your processes as planned.
    3. Check for Updates: If you were expecting changes to be made, ensure that any updates or modifications have been correctly applied and saved.

    Related Information:

    • Control Plans in SAP: Control plans are used in quality management to define the quality control processes for products. They include information about inspection characteristics, methods, and responsibilities.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as QP01 (Create Control Plan), QP02 (Change Control Plan), and QP03 (Display Control Plan) to manage control plans effectively.
    • Documentation: Refer to SAP documentation or help files for more detailed information on control plans and their management within the SAP Quality Management module.

    If you continue to encounter issues or if the message is unexpected, consider reaching out to your SAP support team or consulting the SAP community for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant