Do you have any question about this error?
Message type: E = Error
Message class: QD - Message-Id. für Dynamisierung
Message number: 236
Message text: You cannot change a sampling procedure with a sampling scheme
The sampling procedure that you want to change is already used in a
plan. The assignment of a sampling scheme is no longer possible.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
QD236
- You cannot change a sampling procedure with a sampling scheme ?The SAP error message QD236, which states "You cannot change a sampling procedure with a sampling scheme," typically occurs in the context of quality management when trying to modify a sampling procedure that is already linked to a sampling scheme. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Linkage to Sampling Scheme: The error arises because the sampling procedure you are trying to change is currently associated with a sampling scheme. In SAP, once a sampling procedure is linked to a sampling scheme, it becomes locked for changes to ensure data integrity and consistency.
- Data Integrity: SAP enforces this restriction to prevent inconsistencies that could arise from changing a sampling procedure that is actively used in quality inspections.
Solution:
Remove Linkage: To resolve the error, you need to first remove the linkage of the sampling procedure from the sampling scheme. This can typically be done in the configuration settings where the sampling scheme is defined.
- Navigate to the relevant transaction (e.g.,
QDV1
for creating sampling schemes).- Locate the sampling scheme that is using the sampling procedure.
- Remove or change the sampling procedure associated with the sampling scheme.
Modify the Sampling Procedure: Once the sampling procedure is no longer linked to any sampling scheme, you can proceed to make the necessary changes to the sampling procedure.
- Use transaction
QDP1
to change the sampling procedure as needed.Re-link if Necessary: After making the changes, if you need to use the modified sampling procedure, you can re-link it to the sampling scheme.
Related Information:
QDP1
: Change Sampling ProcedureQDV1
: Create Sampling SchemeQDV2
: Change Sampling SchemeBy following these steps, you should be able to resolve the QD236 error and successfully modify your sampling procedure.
Get instant SAP help. Start your 7-day free trial now.
QD235
You cannot enter a k factor greater than 100
What causes this issue? You cannot enter a k factor that is greater than 100. A value of this size is not realistic. When you use a Wilrich Nonogramm...
QD234
You have entered a value greater than 5 for the k factor
What causes this issue? When you determine a k factor using, for example, the Wilrich-Nomogramm, then you cannot enter a value that is greater than 5...
QD237
You cannot delete the procedure- allowed relationships are blocked by &
What causes this issue? The sampling procedure that you want to delete exists in the allowed relationships. The system tries to delete the correspo...
QD238
Error when blocking allowed relationships (RC &)
What causes this issue? The sampling procedure that you want to delete exists in the allowed relationships. The system tries to delete the correspo...
Click on this link to search all SAP messages.