Do you have any question about this error?
Message type: E = Error
Message class: QA - QM : Inspection lots
Message number: 309
Message text: Goods receipt blocked for this purchasing document item by QM
It is defined for material &v1& in plant &v2& that no goods receipt may
occur if the source inspection is rejected.
The inspection lot &v3& was rejected. This is why there is no goods
receipt for this purchasing document item.
Delete the material document item if you want to post the other
material document items as a goods receipt.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
QA309
- Goods receipt blocked for this purchasing document item by QM ?The SAP error message QA309 indicates that a goods receipt (GR) is blocked for a specific purchasing document item due to Quality Management (QM) settings. This typically occurs when the system is configured to perform quality inspections on goods received, and the inspection lot has not been cleared or is still in process.
Cause:
- Quality Inspection Required: The purchasing document item is set up to require a quality inspection upon receipt. This is often determined by the material master settings or the purchasing info record.
- Inspection Lot Status: An inspection lot may have been created for the goods receipt, and it may be in a status that prevents the GR from being completed (e.g., "In Process" or "Blocked").
- Quality Management Settings: The configuration in the Quality Management module may dictate that certain materials or vendors require inspection before the goods can be accepted into inventory.
Solution:
- Check Inspection Lot: Go to the Quality Management module and check the status of the inspection lot associated with the goods receipt. If the inspection lot is still open or blocked, you may need to complete the inspection process.
- Complete Inspection: If the inspection lot is in process, complete the inspection and record the results. Once the inspection is completed and the lot is released, you should be able to proceed with the goods receipt.
- Review Material Master: Check the material master record for the item in question to see if the quality inspection settings are appropriate. You may need to adjust the settings if they are not aligned with your business processes.
- Consult QM Configuration: If necessary, consult with your SAP QM configuration team to ensure that the settings for quality inspection are correctly configured for the materials and vendors involved.
- Use Transaction Codes: You can use transaction codes like
QA32
to manage inspection lots orMIGO
to process goods receipts, depending on your access and the specific actions you need to take.Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant specializing in QM for further assistance.
Get instant SAP help. Start your 7-day free trial now.
QA308
You can longer confirm for the order &
What causes this issue? You can no longer confirm for this QM order. That is why you cannot enter it in the inspection setup data.System Response Th...
QA307
The 'Active' indicator is canceled for inspection type &1
What causes this issue? The inspection type &v1& was activated. However, no quality score procedure has been assigned and this is not permitt...
QA310
Customer enhancement QAAT0002 has been incorrectly implemented
What causes this issue? The customer enhancement QAAT0002 supplies incorrect parameters because it has been incorrectly implemented.System Response ...
QA311
Could not read the text for the inspection type
What causes this issue? The inspection lot was created when supply relationships were released. The system attempts to define the status text as a te...
Click on this link to search all SAP messages.