Do you have any question about this error?
Message type: E = Error
Message class: Q2 - Messages for Development Classes SDBO and SDBA
Message number: 336
Message text: Action cannot be scheduled to start in the past
You have attempted to schedule an action in the past.
The action is not scheduled.
Choose a start date in the future.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
Q2336
- Action cannot be scheduled to start in the past ?The SAP error message Q2336, which states "Action cannot be scheduled to start in the past," typically occurs when you attempt to schedule a quality action (such as a quality inspection or a quality notification) with a start date or time that is earlier than the current date and time. This is a common validation check in SAP to ensure that actions are scheduled for the future.
Cause:
- Incorrect Date/Time Input: The user has entered a start date or time that is earlier than the current system date and time.
- System Clock Issues: The system clock on the SAP server may be set incorrectly, leading to discrepancies in date and time.
- Data Entry Errors: Users may inadvertently select the wrong date or time due to user interface issues or misunderstanding.
Solution:
- Check Current Date/Time: Verify the current date and time on the SAP system. You can do this by using transaction codes like
SE38
to run a report or simply checking the system status.- Adjust Scheduled Date/Time: When scheduling the action, ensure that the start date and time are set to a future date and time. You can do this by:
- Selecting a date/time that is later than the current date/time.
- Using date pickers or calendars provided in the SAP interface to avoid manual entry errors.
- User Training: Provide training to users on how to correctly enter dates and times in the system to prevent future occurrences of this error.
- System Configuration: If the issue persists and is related to system settings, consult with your SAP Basis team to ensure that the server's time settings are correct and synchronized with a reliable time source.
Related Information:
By following these steps, you should be able to resolve the Q2336 error and successfully schedule your quality actions in SAP.
Get instant SAP help. Start your 7-day free trial now.
Q2335
Internal error: problem changing an action
What causes this issue? An action could not changed. This is most likely due to a programming error.System Response The action is not changed.How to...
Q2334
Internal error: problem scheduling a job
What causes this issue? An action could not be scheduled. A background job with the same name may already exist.System Response The action is not sc...
Q2337
Start date conflicts with a scheduled action
What causes this issue? You have attempted to schedule a new action. However, the start date for this action conflicts with another action.System Res...
Q2338
Parameter type & unknown
What causes this issue? A parameter type in table SDBAC is unknown.System Response The parameter type is ignored.How to fix this error? If you have...
Click on this link to search all SAP messages.