Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 818
Message text: Specify internal currency, capacity, costs, and schedule.
You want to execute price determination but have not entered all of the
required information.
Price determination will be terminated.
Enter the following information:
Internal currency
Optimum capacity
Schedule
Costs
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PV818
- Specify internal currency, capacity, costs, and schedule. ?The SAP error message PV818 ("Specify internal currency, capacity, costs, and schedule") typically occurs in the context of project management or production planning within the SAP system. This error indicates that certain required fields related to project or production planning data have not been filled out correctly or are missing.
Cause:
The error can arise due to several reasons:
- Missing Data: Required fields such as internal currency, capacity, costs, or scheduling information have not been entered.
- Incorrect Configuration: The project or production order may not be configured correctly, leading to missing parameters.
- Authorization Issues: The user may not have the necessary permissions to enter or modify the required data.
- System Settings: The system may not be set up to handle the specific type of project or production order being created.
Solution:
To resolve the PV818 error, you can take the following steps:
Check Required Fields: Ensure that all mandatory fields are filled out. This includes:
- Internal currency (usually the currency in which costs are calculated).
- Capacity (the resources or personnel assigned to the project).
- Costs (estimated or actual costs associated with the project).
- Schedule (start and end dates, milestones, etc.).
Review Configuration: Verify that the project or production order is configured correctly in the system. This may involve checking the project definition or order type settings.
User Permissions: Ensure that the user has the necessary authorizations to enter or modify the required data. If not, contact your SAP administrator to adjust permissions.
Consult Documentation: Refer to SAP documentation or help files for specific guidance on the fields that need to be filled out for the type of project or order you are working with.
System Settings: If the issue persists, check with your SAP Basis or technical team to ensure that the system settings are appropriate for the type of project or production order being created.
Testing: After making the necessary changes, try to save or process the project or order again to see if the error is resolved.
Related Information:
If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP project management or production planning.
Get instant SAP help. Start your 7-day free trial now.
PV817
Enter a value for amount available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV816
Enter the information "&1"
What causes this issue? You are attempting to create an object in Training and Event Managment master data. This involves using the action &V2&am...
PV820
Attendance object could not be found; editing is obsolete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV821
Attendance request was submitted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.