Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 656
Message text: & is required for billing and activity allocation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV656
- & is required for billing and activity allocation ?The SAP error message PV656 typically indicates that a certain condition or requirement is not met for billing or activity allocation. This error often arises in the context of controlling (CO) and financial accounting (FI) modules, particularly when dealing with internal orders, cost centers, or projects.
Cause of Error PV656
The error message PV656 usually occurs due to one of the following reasons:
- Missing Master Data: The required master data (such as cost centers, internal orders, or projects) may not be properly set up or may be missing.
- Incorrect Configuration: The configuration settings for billing or activity allocation may not be correctly defined in the system.
- Incomplete Document: The document being processed may be incomplete or missing necessary information.
- Authorization Issues: The user may not have the necessary authorizations to perform the billing or activity allocation.
- Period Closing: The posting period may be closed, preventing any further postings.
Solution to Error PV656
To resolve the PV656 error, you can take the following steps:
- Check Master Data: Ensure that all required master data is correctly set up and active. This includes verifying that cost centers, internal orders, and projects are properly defined.
- Review Configuration: Check the configuration settings in the SAP system for billing and activity allocation. Ensure that all necessary settings are in place and correctly configured.
- Complete the Document: If the error is due to an incomplete document, review the document for any missing information and complete it as necessary.
- Authorization Check: Verify that the user has the necessary authorizations to perform the required actions. If not, consult with your SAP security team to obtain the necessary permissions.
- Check Posting Period: Ensure that the posting period is open. If it is closed, you may need to open it or post in a different period.
Related Information
KSB1
(Cost Centers: Actual Line Items), CJI3
(Project Actual Line Items), or KO03
(Display Order) to analyze the data related to the error.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PV655
Use different values in the second column
What causes this issue? A value in the second column occurs in multiple lines.System Response The second column belongs to table T77S2 and values en...
PV654
Menu / function must be at least 5 characters long
What causes this issue? The system saves the first four characters in the field CLUID in table T77S1. The characters from position five on are saved ...
PV657
Activity & is not assigned to notification abbreviation &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV658
& required for execution of materials reservation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.