Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix PV407 - Resource is already locked


PV407 - Overview

  • Message type: E = Error

  • Message class: PV - Training and Event Management

  • Message number: 407

  • Message text: Resource is already locked

  • Show details Hide details
  • What causes this issue?

    The resource is already locked in the selection period.

    How to fix this error?

    Choose a valid lock period.

    Error message extract from SAP system. Copyright SAP SE.


PV407 - Details

  • The SAP error message PV407 ("Resource is already locked") typically occurs when a user or process attempts to access a resource (such as a work center, production order, or other object) that is currently locked by another user or process. This locking mechanism is a part of SAP's concurrency control to prevent data inconsistencies.
    Causes:
    
    Concurrent Access: Another user or process is currently using the resource, leading to a lock.
    Long-Running Transactions: A transaction that takes a long time to complete may hold a lock longer than expected.
    Unfinished Processes: A previous process may not have been completed or released properly, leaving the resource locked.
    System Errors: Occasionally, system errors or crashes can leave resources in a locked state.
    
    Solutions:
    
    Wait and Retry: If the lock is temporary, waiting for the other user or process to complete their transaction may resolve the issue.
    Identify the Lock: Use transaction codes like SM12 (for lock entries) to identify which user

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PV407 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author