How To Fix PV348 - There are no resources available during this time period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PV - Training and Event Management

  • Message number: 348

  • Message text: There are no resources available during this time period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PV348 - There are no resources available during this time period ?

    The SAP error message PV348, which states "There are no resources available during this time period," typically occurs in the context of project management or resource planning within SAP. This error indicates that the system cannot find any available resources (such as personnel, equipment, or materials) for the specified time period when trying to schedule or allocate resources for a task or project.

    Causes:

    1. Resource Unavailability: The resources you are trying to allocate may be booked for other tasks or projects during the specified time period.
    2. Incorrect Time Period: The time period you are trying to schedule may be outside the defined availability of the resources.
    3. Resource Master Data Issues: There may be issues with the resource master data, such as incorrect availability settings or missing data.
    4. Capacity Planning Settings: The capacity planning settings may not be configured correctly, leading to incorrect availability calculations.
    5. Project or Task Constraints: The project or task may have constraints that limit the availability of resources.

    Solutions:

    1. Check Resource Availability: Review the availability of the resources in the specified time period. You can do this by checking the resource calendar or availability reports.
    2. Adjust Time Period: If the time period is incorrect, adjust it to a time when resources are available.
    3. Review Resource Master Data: Ensure that the resource master data is correctly set up, including availability, working hours, and any other relevant settings.
    4. Modify Scheduling Parameters: If applicable, modify the scheduling parameters or constraints for the project or task to allow for more flexibility in resource allocation.
    5. Consult Capacity Planning: If you are using capacity planning, review the settings to ensure they are configured correctly to reflect actual resource availability.
    6. Check for Conflicts: Look for any conflicts or overlapping bookings that may be causing the resources to be unavailable.

    Related Information:

    • Transaction Codes: You may use transaction codes like CM01 (Capacity Planning) or CATS (Cross-Application Time Sheet) to check resource availability and bookings.
    • Reports: Utilize standard SAP reports for resource planning and availability, such as S_ALR_87013558 (Capacity Evaluation) or S_ALR_87013559 (Resource Planning).
    • Documentation: Refer to SAP Help documentation for detailed information on resource management and scheduling within your specific SAP module (e.g., SAP PS, SAP PM).

    If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in resource management within SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author