Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 090
Message text: The waiting list has reached maximum capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV090
- The waiting list has reached maximum capacity ?The SAP error message PV090, which states "The waiting list has reached maximum capacity," typically occurs in the context of SAP's scheduling and resource management, particularly in the Production Planning (PP) or Project System (PS) modules. This error indicates that the system has a limit on the number of entries that can be held in the waiting list for a particular operation or resource, and that limit has been reached.
Cause:
- Maximum Capacity Reached: The waiting list for a specific operation or resource has reached its predefined limit. This can happen if there are too many requests or operations queued for processing.
- Configuration Settings: The maximum number of entries allowed in the waiting list may be set too low in the system configuration.
- Long-running Processes: If processes are taking longer than expected to complete, they may accumulate in the waiting list, leading to this error.
- Resource Constraints: Limited resources or capacity issues can lead to a backlog of operations waiting to be processed.
Solution:
Increase Waiting List Capacity:
- You can adjust the configuration settings in the SAP system to increase the maximum number of entries allowed in the waiting list. This typically involves accessing the relevant configuration settings in the SAP system (e.g., using transaction codes like SPRO).
Monitor and Optimize Processes:
- Review the processes that are causing the backlog. Identify any long-running jobs or operations that may be contributing to the issue and optimize them if possible.
- Ensure that resources are adequately allocated and that there are no bottlenecks in the production or project processes.
Clear the Waiting List:
- If possible, clear out unnecessary entries from the waiting list. This may involve canceling or rescheduling certain operations that are not critical.
Check for Errors:
- Investigate if there are any underlying issues causing delays in processing. This could include system errors, resource unavailability, or other operational issues.
Consult Documentation:
- Refer to SAP documentation or support resources for specific guidance on managing waiting lists and related configurations.
Related Information:
CO02
(Change Production Order), C223
(Maintain Capacity Planning), or C201
(Create Work Center) to manage production and resource planning.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or technical team for further investigation and support.
Get instant SAP help. Start your 7-day free trial now.
PV089
You do not have authorization to perform function &
What causes this issue? You do not have authorization to perform one of the following functions: PV00: Book attendance PV01: Rebook attendance PV02: ...
PV088
There are event dates scheduled for the selected business event type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV091
Maximum number of attendees reached; proceed with waiting list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV092
Attendance booked partially; continue with waiting list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.