Message text: Factory calendar date cannot be determined for calendar &1 / date &2
Factory calendar date determination is not possible.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
A factory calendar is used to determine a factory date during due date
rule calculation. Check the due date rule used and the validity range of
the factory calendar.
Use the <LS>SAP Calendar</> transaction (SCAL) to check the validity of
the factory calendar used.
Error message extract from SAP system. Copyright SAP SE.
PSSC_TOOLS056
- Factory calendar date cannot be determined for calendar &1 / date &2 ?The SAP error message PSSC_TOOLS056 indicates that the system is unable to determine a factory calendar date for a specified calendar and date. This typically occurs in scenarios where date calculations or scheduling are involved, such as in production planning or project management.
Cause: Invalid Calendar Configuration: The specified factory calendar (&1) may not be properly configured or may not exist in the system. Date Outside Valid Range: The date (&2) provided may fall outside the range of valid dates defined in the factory calendar. Missing Factory Calendar Assignment: The relevant organizational unit (e.g., plant, project) may not have a factory calendar assigned. Public Holidays or Non-Working Days: The date may coincide with a public holiday or a non-working day that is not accounted for in the factory calendar.
Solution: Check Factory Calendar Configuration: Go to the transaction code SCAL (Maintain Factory Calendar) and verify that the factory calendar exists and is correctly configured. Ensure that the calendar is
Get instant SAP help. Sign up for our Free Essentials Plan.
PSSC_TOOLS055
Minimum date (01.01.1900) reached; no further date decrease allowed
What causes this issue? The minimum date (01.01.1900) of the calendar has been reached during the date calculation operation using the Social Service...
PSSC_TOOLS054
Maximum date (31.12.9999) reached; no further date increase allowed
What causes this issue? The maximum date (31.12.9999) of the calendar has been reached during the date calculation operation using the Social Service...
PSSC_TOOLS057
Unable to build period for frequency type &1 / date &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSSC_TOOLS058
Check your Customizing settings: SXP type: &1, FrqMType: &2, DDRType: &3
What causes this issue? Required entries are missing or invalid in one or more of the following Customizing activites: Customizing for <LS>Publ...