Do you have any question about this error?
Message type: E = Error
Message class: PSS4_MSG - Message class for simplified Projects
Message number: 155
Message text: Enter a valid value for Project Currency
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSS4_MSG155
- Enter a valid value for Project Currency ?The SAP error message PSS4_MSG155, which states "Enter a valid value for Project Currency," typically occurs when there is an issue with the currency settings in a project-related transaction or configuration. Here’s a breakdown of the potential causes, solutions, and related information for this error:
Causes:
- Invalid Currency Code: The currency code entered may not be valid or recognized by the system.
- Currency Not Configured: The currency may not be configured for the project or the relevant organizational unit.
- Missing Currency Settings: The project may not have been assigned a currency, or the currency settings may be incomplete.
- User Authorization: The user may not have the necessary permissions to access or modify currency settings.
- Data Entry Error: There may be a typographical error in the currency code entered.
Solutions:
- Check Currency Code: Verify that the currency code entered is correct and exists in the system. Common currency codes include USD (US Dollar), EUR (Euro), etc.
- Project Configuration: Ensure that the project is properly configured with a valid currency. This can usually be done in the project definition or project settings.
- Currency Settings: Navigate to the relevant configuration settings in SAP (e.g., SPRO) and check if the currency is set up correctly for the project type.
- User Permissions: Ensure that the user has the necessary authorizations to work with project currencies. This may require coordination with the SAP security team.
- Data Entry Review: Double-check the input for any typographical errors or incorrect formats.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
PSS4_MSG154
Enter planned start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG153
Please enter a value for Project ID.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG156
Enter a value for Planned Finish Date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG157
You do not have authorizations to edit project element - &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.