Do you have any question about this error?
Message type: E = Error
Message class: PSS4_MSG - Message class for simplified Projects
Message number: 154
Message text: Enter planned start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSS4_MSG154
- Enter planned start date ?The SAP error message PSS4_MSG154, which states "Enter planned start date," typically occurs in the context of project management or production planning within the SAP system. This error indicates that a required field for the planned start date has not been filled in, which is necessary for the system to proceed with the operation you are trying to perform.
Cause:
- Missing Input: The most common cause is that the user has not entered a planned start date in the relevant field.
- Configuration Issues: There may be configuration settings in the project or production planning module that require a planned start date to be filled in.
- Data Entry Errors: The user may have overlooked the field or entered data in an incorrect format.
Solution:
- Enter Planned Start Date: The immediate solution is to navigate to the relevant screen where the error occurred and enter a valid planned start date in the designated field.
- Check Field Requirements: Review the configuration settings to ensure that the planned start date is set as a required field. If it is not necessary for your process, you may need to adjust the settings.
- Validation of Date Format: Ensure that the date is entered in the correct format as required by the SAP system (e.g., DD/MM/YYYY or MM/DD/YYYY depending on your system settings).
- Consult Documentation: If you are unsure about the required fields for your specific transaction, consult the SAP documentation or help resources related to the module you are working in.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who can provide more tailored assistance based on your specific SAP environment and configuration.
Get instant SAP help. Start your 7-day free trial now.
PSS4_MSG153
Please enter a value for Project ID.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG152
Choose an Availability Control Profile that is mapped to Global Currency
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG155
Enter a valid value for Project Currency
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG156
Enter a value for Planned Finish Date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.