How To Fix PSS4_MSG121 - &1 - Responsible Cost Center is the same as that of the project


PSS4_MSG121 - Overview

  • Message type: E = Error

  • Message class: PSS4_MSG - Message class for simplified Projects

  • Message number: 121

  • Message text: &1 - Responsible Cost Center is the same as that of the project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSS4_MSG121 - &1 - Responsible Cost Center is the same as that of the project ?
    The SAP error message PSS4_MSG121 indicates that there is an issue with the assignment of the responsible cost center in relation to a project. Specifically, the error states that the responsible cost center is the same as that of the project, which is not allowed in certain configurations or scenarios within SAP.
    
    Cause: This error typically arises when: The cost center assigned to a project is the same as the cost center that is designated as responsible for the project. The system is configured to prevent the same cost center from being responsible for both the project and its associated costs, as this could lead to issues in cost tracking and reporting.
    Solution: To resolve this error, you can take the following steps: Check Cost Center Assignment: Review the project definition and the cost center assigned to it. Ensure that the responsible cost center is different from the cost center assigned to the project. Change the Responsible Cost Center: If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author