Message type: E = Error
Message class: PSS4_MSG - Message class for simplified Projects
Message number: 117
Message text: Planned Finish date must be earlier than or equal to &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSS4_MSG117
- Planned Finish date must be earlier than or equal to & ?The SAP error message PSS4_MSG117 indicates that there is an issue with the planned finish date in a project or production order. Specifically, the error states that the planned finish date must be earlier than or equal to a specified date (represented by the "&" symbol in the message). This typically occurs in scenarios where the system is validating date constraints for scheduling or planning purposes.
Cause: Incorrect Date Entry: The planned finish date has been entered incorrectly, possibly set to a date that is later than the allowed date. Scheduling Constraints: The system has certain rules or constraints that dictate that the planned finish date cannot exceed a certain date, which may be based on project timelines, resource availability, or other scheduling parameters.
Configuration Issues: There may be configuration settings in the project or production order that enforce specific date rules, leading to this error.
Solution: Check the Planned Finish Date: Review the planned finish
Get instant SAP help. Sign up for our Free Essentials Plan.
PSS4_MSG116
Planned Start date must be later than or equal to &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG115
Plant & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG118
&1 - Functional Area is the same as that of the project
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSS4_MSG119
Costing sheet cannot be maintained for this project profile.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.