How To Fix PSS4_MSG104 - Project is released


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSS4_MSG - Message class for simplified Projects

  • Message number: 104

  • Message text: Project is released

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSS4_MSG104 - Project is released ?
    The SAP error message PSS4_MSG104 indicates that a project is in a "released" status, which means that it cannot be modified or changed until it is set back to a "not released" status. This is a common scenario in project management within SAP, particularly in the Project System (PS) module.
    
    Cause: The error occurs when a user attempts to make changes to a project that has already been released. In SAP, once a project is released, it is locked for modifications to ensure data integrity and to prevent changes that could affect project execution and reporting.
    Solution: To resolve this error, you need to follow these steps: Check Project Status: Verify the current status of the project. You can do this by navigating to the project in the Project System and checking its status. Unrelease the Project: If you need to make changes to the project, you will have to "unrelease" it. This can typically be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant