How To Fix PSS4_MSG102 - Project is unlocked


PSS4_MSG102 - Overview

  • Message type: E = Error

  • Message class: PSS4_MSG - Message class for simplified Projects

  • Message number: 102

  • Message text: Project is unlocked

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSS4_MSG102 - Project is unlocked ?
    The SAP error message PSS4_MSG102, which states "Project is unlocked," typically indicates that the project you are trying to access or modify is currently in an unlocked state. This means that the project is not locked for changes, which can lead to confusion if you are expecting it to be locked for certain operations.
    
    Cause: Project Status: The project may be in a status that allows changes, but you are trying to perform an operation that requires the project to be locked. User Permissions: The user may not have the necessary permissions to lock the project or perform certain actions. System Configuration: The system may be configured in a way that does not enforce locking for certain project types or statuses.
    Solution: Check Project Status: Verify the current status of the project. If it is indeed unlocked and you need it to be locked for your operation, you may need to lock it manually. Lock the Project:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • PSS4_MSG101 Project is locked
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PSS4_MSG100 Project is closed
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PSS4_MSG103 Project profile code cannot be updated
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • PSS4_MSG104 Project is released
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker