Do you have any question about this error?
Message type: E = Error
Message class: PSM_S4C_ASSET_MD -
Message number: 001
Message text: Either a work package (WBS element) or a cost center is required.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PSM_S4C_ASSET_MD001
- Either a work package (WBS element) or a cost center is required. ?The SAP error message PSM_S4C_ASSET_MD001 indicates that a work package (WBS element) or a cost center is required for the transaction you are trying to execute. This error typically occurs in the context of asset accounting or project system modules when the system expects a valid assignment for cost tracking or project management.
Cause:
- Missing WBS Element or Cost Center: The transaction you are attempting to perform requires either a WBS element or a cost center to be specified, but neither has been provided.
- Incorrect Configuration: The configuration settings in the system may not be set up correctly to allow for the transaction without these elements.
- Data Entry Error: There may have been an oversight in entering the required fields during the transaction.
Solution:
Check Required Fields: Ensure that you have entered either a valid WBS element or a cost center in the relevant fields of the transaction.
- If you are working with project-related transactions, ensure that the WBS element is correctly defined and active.
- If you are using cost centers, verify that the cost center is valid and active in the system.
Review Configuration: If you are consistently encountering this error, review the configuration settings in the SAP system to ensure that the requirements for the transaction are correctly defined. This may involve checking:
- The settings in the Project System (PS) module.
- The settings in the Controlling (CO) module.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the transaction you are trying to execute. This can provide insights into what fields are mandatory and how to properly configure them.
User Authorization: Ensure that you have the necessary authorizations to access and use the WBS elements or cost centers in question.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert who can provide further assistance.
Related Information:
Transaction Codes: Familiarize yourself with the relevant transaction codes that may be involved in asset accounting or project management, such as:
SAP Notes: Check for any SAP Notes related to this error message, as they may provide additional context or solutions based on known issues.
Training and Documentation: Consider reviewing training materials or documentation related to asset management and project systems in SAP to better understand the requirements for transactions involving WBS elements and cost centers.
By following these steps, you should be able to resolve the error and proceed with your transaction in SAP.
Get instant SAP help. Start your 7-day free trial now.
PSM_S4C_ASSET_MD000
Identical account assignment values are required for fixed asset &1.
What causes this issue? The fixed account assignment values from the WBS element and cost center are not identical for the fixed asset &V1&.S...
PSM_S4C002
The Company Code is not assigned to Public Sector Scenarios
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSM_S4C_ASSET_MD002
The field &1 is mandatory but initial.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PSM_S4C_BUDGET000
-----------Header validation messages -------------------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.