How To Fix PSHLP_MSG_CL103 - Data loaded to the project cache


PSHLP_MSG_CL103 - Overview

  • Message type: E = Error

  • Message class: PSHLP_MSG_CL - Message Class for PS EhP4 Developments

  • Message number: 103

  • Message text: Data loaded to the project cache

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PSHLP_MSG_CL103 - Details

  • The SAP error message PSHLP_MSG_CL103, which states "Data loaded to the project cache," typically occurs in the context of SAP Project System (PS) when there are issues related to the project cache. This message indicates that the system has loaded data into the project cache, but it may not be able to retrieve or display the data correctly due to various reasons.
    Causes:
    
    Cache Inconsistency: The project cache may be inconsistent or corrupted, leading to issues when trying to access project-related data.
    Data Changes: If there have been recent changes to project data (e.g., changes in WBS elements, activities, or other project-related data), the cache may not have been updated accordingly.
    System Performance: High system load or performance issues can sometimes lead to problems with cache management.
    User Authorizations: Insufficient authorizations for accessing certain project data can also trigger this message.
    
    Solutions:
    
    
    Clear the Project Cache:
    
    You can clear the project cache to resolve inconsistencies. This can typically

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PSHLP_MSG_CL103 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker