How To Fix PSB_API_MSGCL124 - Forward scheduling (enter start date)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 124

  • Message text: Forward scheduling (enter start date)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL124 - Forward scheduling (enter start date) ?
    The SAP error message PSB_API_MSGCL124 typically occurs in the context of project scheduling within the SAP Project System (PS) module. This error indicates that a forward scheduling operation requires a start date to be specified, but it has not been provided.
    
    Cause: The error arises when: A user attempts to perform a forward scheduling operation without specifying a start date. The system requires a start date to calculate the project timeline and schedule tasks accordingly.
    Solution: To resolve this error, you should: Specify a Start Date: Ensure that you enter a valid start date for the scheduling operation. This can usually be done in the scheduling screen or the relevant transaction where you are trying to perform the scheduling. Check Project Settings: Verify that the project settings allow for forward scheduling and that all necessary fields are filled out correctly. Review Dependencies: Ensure that all predecessor and successor relationships are correctly defined, as these can affect scheduling. Use the Correct

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker