How To Fix PSB_API_MSGCL090 - Invalid combination of activity type selected for &1 &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 090

  • Message text: Invalid combination of activity type selected for &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL090 - Invalid combination of activity type selected for &1 &2 ?
    The SAP error message PSB_API_MSGCL090 indicates that there is an invalid combination of activity types selected for a specific project or work breakdown structure (WBS) element. This error typically occurs in the context of project system (PS) modules when trying to assign or process activities that do not align with the expected configurations or settings.
    
    Cause: Invalid Activity Type: The activity type you are trying to use may not be valid for the specific project or WBS element.
    Configuration Issues: There may be configuration settings in the project system that restrict the use of certain activity types for specific projects or WBS elements. Missing Assignments: The activity type may not be assigned to the relevant controlling area or may not be set up correctly in the system. Inconsistent Data: There may be inconsistencies in the data related to the project or WBS element that lead to this error.
    Solution: Check Activity Type Configuration: Go to the configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author