How To Fix PSB_API_MSGCL089 - Milestone does not belong to the specified activity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSB_API_MSGCL -

  • Message number: 089

  • Message text: Milestone does not belong to the specified activity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSB_API_MSGCL089 - Milestone does not belong to the specified activity ?

    The SAP error message PSB_API_MSGCL089 indicates that a milestone you are trying to associate or process does not belong to the specified activity in a project. This error typically occurs in the context of Project System (PS) module when working with project milestones and activities.

    Cause:

    1. Incorrect Milestone Assignment: The milestone you are trying to link or reference is not correctly assigned to the activity in the project structure.
    2. Project Structure Issues: The project structure may have been altered, and the milestone may have been removed or not properly linked to the activity.
    3. Data Consistency Issues: There may be inconsistencies in the project data, such as missing or incorrect relationships between activities and milestones.
    4. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or modify the milestone associated with the activity.

    Solution:

    1. Check Milestone Assignment:

      • Go to the project structure and verify that the milestone is correctly assigned to the activity. You can do this by navigating to the project definition and checking the relationships.
    2. Review Project Structure:

      • Ensure that the project structure is intact and that the milestone is indeed part of the specified activity. You can use transaction codes like CJ20N (Project Builder) to review the project hierarchy.
    3. Reassign Milestone:

      • If the milestone is not linked correctly, you may need to reassign it to the correct activity. This can be done in the Project Builder or through the relevant transaction for managing milestones.
    4. Check for Data Consistency:

      • Run consistency checks on the project data to identify any discrepancies. You can use transaction CJ_CHECK to perform checks on the project structure.
    5. Authorization Check:

      • Ensure that you have the necessary authorizations to access and modify the project and its components. If you suspect an authorization issue, contact your SAP security team.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on managing milestones and activities in the Project System.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and CJ03 (Display Project).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Engage with SAP community forums or user groups for shared experiences and solutions from other users who may have encountered the same issue.

    By following these steps, you should be able to resolve the error and ensure that milestones are correctly associated with their respective activities in your SAP Project System.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker