How To Fix PS_DMND125 - Demand start date should be within the work package date range.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PS_DMND - Messages of Demand Object

  • Message number: 125

  • Message text: Demand start date should be within the work package date range.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PS_DMND125 - Demand start date should be within the work package date range. ?

    The SAP error message PS_DMND125 indicates that there is an issue with the demand start date in relation to the work package date range. This error typically occurs in the context of project management and demand planning within SAP, particularly when working with project systems (PS) or demand management (DM).

    Cause:

    The error arises when the demand start date you are trying to set for a particular demand (such as a project or a work package) falls outside the defined date range of the associated work package. This means that the demand start date is either before the start date or after the end date of the work package.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Work Package Dates: Verify the start and end dates of the work package associated with the demand. You can do this by navigating to the work package in the project system and checking its date settings.

    2. Adjust Demand Start Date: If the demand start date is indeed outside the work package date range, you will need to adjust it. Set the demand start date to a value that falls within the work package's start and end dates.

    3. Modify Work Package Dates: If the demand start date is correct and should remain as is, consider adjusting the work package dates to encompass the demand start date. This may involve changing the project schedule or the work package's planned dates.

    4. Consult Project Documentation: Ensure that any changes made are in line with project requirements and documentation. It’s important to maintain consistency in project planning.

    5. Check for Dependencies: If there are dependencies or constraints linked to the demand or work package, review them to ensure that any changes do not violate project constraints.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) or CJI3 (Project Actual Line Items) to view and manage project-related data.
    • SAP Notes: Check SAP Notes for any known issues or additional guidance related to this error message.
    • User Authorization: Ensure that you have the necessary authorizations to make changes to project dates and demand settings.
    • Testing Changes: After making adjustments, test the changes in a development or quality environment before applying them to the production system to avoid unintended consequences.

    By following these steps, you should be able to resolve the PS_DMND125 error and ensure that your demand planning aligns with the project schedule.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant