How To Fix PROJ_BILLG_ELMNT193 - Cannot prepare billing for future postings of a billing element.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PROJ_BILLG_ELMNT - Project Billing Element Messages

  • Message number: 193

  • Message text: Cannot prepare billing for future postings of a billing element.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PROJ_BILLG_ELMNT193 - Cannot prepare billing for future postings of a billing element. ?

    The SAP error message PROJ_BILLG_ELMNT193 indicates that there is an issue with billing for a project-related billing element, specifically that the system cannot prepare billing for future postings. This typically occurs in the context of project system (PS) billing when there are attempts to bill for costs or revenues that are not yet available or are set in the future.

    Causes:

    1. Future Posting Dates: The billing element may have a posting date that is set in the future, which prevents the system from processing the billing.
    2. Billing Plan Issues: The billing plan associated with the project may not be correctly configured, leading to discrepancies in billing dates.
    3. Incomplete Data: There may be missing or incomplete data related to the billing element, such as costs that have not yet been posted.
    4. Project Status: The project or billing element may be in a status that does not allow for billing (e.g., not released or completed).
    5. Configuration Settings: There may be configuration settings in the project system that restrict billing for future periods.

    Solutions:

    1. Check Posting Dates: Review the posting dates for the billing element and ensure they are set to a date that is not in the future. Adjust the dates if necessary.
    2. Review Billing Plan: Verify the billing plan associated with the project. Ensure that it is correctly set up and that the billing dates align with the project timeline.
    3. Post Missing Costs: Ensure that all necessary costs have been posted to the billing element. If costs are missing, post them before attempting to bill.
    4. Project Status Review: Check the status of the project and the billing element. Ensure that they are in a state that allows for billing (e.g., released).
    5. Consult Configuration: If the issue persists, consult with your SAP configuration team to review the settings related to project billing and ensure they allow for the desired billing processes.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) to review project details, or S_ALR_87013558 (Project Reports) to analyze project costs and revenues.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on project billing issues.
    • Documentation: Refer to SAP documentation on Project System (PS) billing for detailed information on billing elements, billing plans, and related configurations.

    If the problem persists after following these steps, it may be beneficial to engage with SAP support or your internal SAP team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant