Do you have any question about this error?
Message type: E = Error
Message class: PO - Spooler message
Message number: 691
Message text: Resource trace (&1 &2 &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PO691
- Resource trace (&1 &2 &3) ?The SAP error message PO691, which states "Resource trace (&1 &2 &3)," typically relates to issues with resource allocation or tracing in the context of production orders, project management, or similar modules where resources are managed.
Cause:
- Resource Availability: The error may occur if the system cannot find the specified resource or if the resource is not available for the planned operation.
- Configuration Issues: There may be configuration issues in the resource master data or in the production planning settings.
- Incorrect Parameters: The parameters passed to the function or transaction may be incorrect or incomplete.
- Missing Authorizations: The user may not have the necessary authorizations to access or modify the resource.
Solution:
- Check Resource Master Data: Verify that the resource (e.g., machine, labor) exists in the system and is correctly configured. Ensure that it is available for the required time period.
- Review Planning Parameters: Check the planning parameters and ensure that they are set correctly for the production order or project.
- Authorization Check: Ensure that the user has the necessary authorizations to access the resource. This can be done by checking the user roles and authorizations in the SAP system.
- Transaction Logs: Review transaction logs or system logs for more detailed error messages that can provide additional context about the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT support team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the PO691 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
PO690
Resource request &5 (page &1) failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PO689
--------------------------------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROJ_BILLG_ELMNT192
No postings available.Cannot prepare billing for the billing element.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROJ_BILLG_ELMNT193
Cannot prepare billing for future postings of a billing element.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.