Message text: Enter a lead time duration greater than/equal to 0 for constraint &2&1.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PROD_ALLOC_SEQUENCE023
- Enter a lead time duration greater than/equal to 0 for constraint &2&1. ?The SAP error message PROD_ALLOC_SEQUENCE023 indicates that there is an issue with the lead time duration specified for a constraint in the production allocation process. Specifically, the error suggests that the lead time duration must be greater than or equal to zero, but the value provided is either negative or not set.
Cause:
- Negative Lead Time: The lead time for a specific constraint has been set to a negative value, which is not acceptable.
- Missing Value: The lead time duration may not have been defined for the constraint, leading to a default value of zero or a negative interpretation.
- Configuration Issues: There may be issues in the configuration of the production planning or allocation settings that lead to incorrect values being used.
Solution:
Check Lead Time Settings:
- Navigate to the relevant configuration settings in SAP where lead times are defined.
- Ensure that the lead time for the specific constraint (identified by &2&1 in the error message) is set to a non-negative value.
Update the Constraint:
- If you have access to the production allocation or planning transaction, locate the constraint in question and update the lead time to a valid value (greater than or equal to zero).
Review Master Data:
- Check the master data related to the production process, such as material master records, routing, and production versions, to ensure that all relevant lead times are correctly defined.
Consult Documentation:
- Review SAP documentation or help resources related to production allocation and lead time settings for additional guidance.
Testing:
- After making the necessary changes, test the production allocation process again to ensure that the error does not reoccur.
Related Information:
MD04
(Stock/Requirements List), CO01
(Create Production Order), or C223
(Define Production Resources/Tools) to check and modify relevant settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and allocation.
Get instant SAP help. Start your 7-day free trial now.
PROD_ALLOC_SEQUENCE022
The validity period must end later than it starts in constraint &2&1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE021
Sequence group &2&1 must have at least one constraint.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE024
Enter a valid lead time duration unit for constraint &2&1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE025
Sequence group &2&1 is already in use: priority cannot be changed.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.