Message type: E = Error
Message class: PROD_ALLOC_SEQUENCE - T100 Messages for BO Product Allocation Sequence
Message number: 022
Message text: The validity period must end later than it starts in constraint &2&1.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PROD_ALLOC_SEQUENCE022
- The validity period must end later than it starts in constraint &2&1. ?The SAP error message PROD_ALLOC_SEQUENCE022 indicates that there is an issue with the validity period of a constraint in the production allocation process. Specifically, the error states that the end date of the validity period must be later than the start date. This typically occurs when defining constraints for production allocations, such as in the context of production planning or allocation of resources.
Cause: The error is caused by one of the following scenarios: Incorrect Date Entry: The start date of the validity period is set to a date that is later than the end date. Data Entry Error: There may have been a typographical error when entering the dates. Configuration Issue: There could be a misconfiguration in the system that is causing the validity dates to be set incorrectly.
Solution: To resolve this error, you can take the following steps: Check Validity Dates: Go to the transaction or screen where you are defining the constraints. Verify the start and
Get instant SAP help. Sign up for our Free Essentials Plan.
PROD_ALLOC_SEQUENCE021
Sequence group &2&1 must have at least one constraint.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE020
Enter an allocation object for constraint &2&1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE023
Enter a lead time duration greater than/equal to 0 for constraint &2&1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PROD_ALLOC_SEQUENCE024
Enter a valid lead time duration unit for constraint &2&1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.