How To Fix PRJ_CIF_LOG256 - R/3 received activity w/o corresponding network; transfer termininated


PRJ_CIF_LOG256 - Overview

  • Message type: E = Error

  • Message class: PRJ_CIF_LOG - CIF Application Log Messages for Networks

  • Message number: 256

  • Message text: R/3 received activity w/o corresponding network; transfer termininated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRJ_CIF_LOG256 - R/3 received activity w/o corresponding network; transfer termininated ?
    The SAP error message PRJ_CIF_LOG256 indicates that there is an issue with the integration between SAP R/3 and SAP APO (Advanced Planning and Optimization) systems, specifically related to the transfer of project-related data. The error message states that R/3 received an activity without a corresponding network, which means that the system is expecting a network assignment for the activity but cannot find it.
    
    Cause: Missing Network Assignment: The activity in question is likely part of a project that requires a network assignment, but the network is either not created or not properly linked to the activity in the R/3 system. Data Inconsistency: There may be inconsistencies in the data between the R/3 and APO systems, such as missing or incomplete project definitions.
    Configuration Issues: There could be configuration issues in the CIF (Core Interface) settings that are preventing the proper transfer of project data. Master Data Issues: The master data related to the project or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author