Do you have any question about this error?
Message type: E = Error
Message class: /PRA/CA_NIMB -
Message number: 027
Message text: Phase 5 Imbalance exists for & and cannot be overridden.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PRA/CA_NIMB027
- Phase 5 Imbalance exists for & and cannot be overridden. ?The SAP error message
/PRA/CA_NIMB027 Phase 5 Imbalance exists for & and cannot be overridden
typically occurs in the context of the SAP Production Planning (PP) or SAP Advanced Planning and Optimization (APO) modules. This error indicates that there is an imbalance in the planning phase, which prevents the process from proceeding.Cause:
- Data Imbalance: The error usually arises when there is a mismatch in the data related to production orders, stock levels, or demand and supply. This could be due to incorrect or incomplete data entries.
- Configuration Issues: There may be configuration settings in the system that are not aligned with the current planning requirements.
- Master Data Issues: Problems with master data, such as incorrect material master records, bill of materials (BOM), or routing information, can lead to imbalances.
- Planning Parameters: Incorrect planning parameters or settings in the planning run can also cause this error.
Solution:
- Check Data Consistency: Review the relevant data for the production orders, stock levels, and demand/supply. Ensure that all entries are correct and consistent.
- Review Master Data: Verify the master data for the materials involved. Check the material master, BOM, and routing to ensure they are set up correctly.
- Analyze Planning Parameters: Look into the planning parameters used in the planning run. Ensure they are appropriate for the current scenario.
- Run Consistency Checks: Use SAP tools to run consistency checks on the data. This can help identify any discrepancies that need to be resolved.
- Consult Logs: Check the logs for the planning run to identify any specific issues or warnings that may provide more context about the imbalance.
- Adjust Configuration: If necessary, adjust the configuration settings in the system to better align with the planning requirements.
Related Information:
MD04
(Stock/Requirements List) or MD02
(MRP Run) to analyze the situation further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP/APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/PRA/CA_NIMB026
The Delivery Network & is in Processing status.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PRA/CA_NIMB025
Delivery network & sale date & and & cannot be processed simulatenously
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PRA/CA_NIMB028
Net Original Begining Imbalance Volume must equal to zero for & & &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PRA/CA_NIMB029
Net New Begining Imbalance Volume must equal to zero for & & &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.