How To Fix /PRA/CA_NIMB025 - Delivery network & sale date & and & cannot be processed simulatenously


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /PRA/CA_NIMB -

  • Message number: 025

  • Message text: Delivery network & sale date & and & cannot be processed simulatenously

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /PRA/CA_NIMB025 - Delivery network & sale date & and & cannot be processed simulatenously ?

    The SAP error message /PRA/CA_NIMB025 Delivery network & sale date & and & cannot be processed simultaneously typically occurs in the context of SAP's Advanced Planning and Optimization (APO) or similar modules where delivery networks and sale dates are involved in planning processes.

    Cause:

    This error usually arises when there is a conflict in the data being processed. Specifically, it indicates that the system is trying to process a delivery network and a sale date at the same time, which is not allowed. This can happen due to:

    1. Data Configuration Issues: The delivery network and sale date may not be compatible or correctly configured in the system.
    2. Planning Parameters: The planning parameters set in the system may not allow for simultaneous processing of these two elements.
    3. Master Data Issues: There may be inconsistencies or missing information in the master data related to the delivery network or sale date.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Configuration: Review the configuration settings for the delivery network and sale date in the relevant planning area. Ensure that they are set up correctly and that there are no conflicting settings.

    2. Review Planning Parameters: Look into the planning parameters in the APO system. Make sure that the settings allow for the processing of both delivery networks and sale dates as intended.

    3. Validate Master Data: Ensure that the master data related to the delivery network and sale date is complete and accurate. Check for any missing or incorrect entries that could be causing the conflict.

    4. Consult Documentation: Refer to SAP documentation or notes related to this specific error message. There may be specific guidelines or patches available that address this issue.

    5. Test in a Development Environment: If possible, replicate the issue in a development or test environment to better understand the conditions that lead to the error. This can help in identifying the root cause without affecting production data.

    6. Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may have additional insights or solutions based on the specific version of SAP you are using.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this error or provide additional troubleshooting steps.
    • Transaction Codes: Familiarize yourself with transaction codes related to delivery networks and sales planning, such as /SAPAPO/SDP94 for demand planning or /SAPAPO/MC90 for configuration settings.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify and resolve the issue causing the error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant