Do you have any question about this error?
Message type: E = Error
Message class: PR - Forecast: Help messages
Message number: 032
Message text: Preparation canceled after & runs (check the selection)
There are too many objects which correspond to the entered selection
criteria.
The system terminated the processing of the list after &V1& runs.
If you want to process a complete list, narrow down your selection
further.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PR032
- Preparation canceled after & runs (check the selection) ?The SAP error message PR032, which states "Preparation canceled after & runs (check the selection)," typically occurs in the context of running a report or a program that involves data selection, such as a planning run or a report generation. This error indicates that the preparation phase of the process was canceled after a certain number of runs, and it suggests that there may be an issue with the selection criteria or the data being processed.
Causes:
- Selection Criteria Issues: The selection criteria specified for the report or program may be too broad or too narrow, leading to no valid data being found or an excessive amount of data being processed.
- Data Volume: If the data volume is too large, it may exceed system limits or performance thresholds, causing the preparation to be canceled.
- Configuration Errors: There may be configuration issues in the system that affect how the report or program processes data.
- Authorization Issues: The user may not have the necessary authorizations to access certain data, leading to the cancellation of the preparation.
- System Performance: Performance issues, such as memory constraints or database locks, can also lead to this error.
Solutions:
- Check Selection Criteria: Review the selection criteria used in the report or program. Ensure that they are appropriate and that they will yield a manageable amount of data.
- Limit Data Volume: If possible, try to limit the data volume by applying additional filters or running the report for a smaller time frame or specific subsets of data.
- Review Configuration: Check the configuration settings related to the report or program to ensure they are set up correctly.
- Check Authorizations: Verify that the user running the report has the necessary authorizations to access the data being processed.
- Monitor System Performance: Use transaction codes like ST22 (Dump Analysis) or SM21 (System Log) to check for any performance issues or errors in the system that may be affecting the report execution.
- Consult SAP Notes: Look for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide additional troubleshooting steps.
Related Information:
If the issue persists after trying the above solutions, it may be necessary to involve your SAP Basis or technical team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
PR031
Replenishment lead time is greater than 999 days (check this)
What causes this issue? The replenishment lead time calculated by the system exceeds 999 days. The replenishment lead time is calculated as follows: ...
PR030
Re-evaluation for MRP controller &, material & in plant & follows
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PR033
No forecast values exist for calculating the reorder level
What causes this issue? The reorder level should be calculated automatically. However, due to the fact that no forecast values exist for the material...
PR034
Safety stock not calculated as servive level=0
What causes this issue? The safety stock can only be calculated if the service level is defined in the material master record.System Response The sy...
Click on this link to search all SAP messages.