Message type: E = Error
Message class: PR - Forecast: Help messages
Message number: 030
Message text: Re-evaluation for MRP controller &, material & in plant & follows
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PR030
- Re-evaluation for MRP controller &, material & in plant & follows ?The SAP error message PR030 typically indicates an issue related to the Material Requirements Planning (MRP) process, specifically concerning the re-evaluation of materials assigned to a particular MRP controller in a specific plant. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.
Cause:
- Missing or Incorrect MRP Data: The material may not have the necessary MRP data set up correctly in the system. This includes settings like MRP type, lot size, and planning parameters.
- MRP Controller Issues: The MRP controller assigned to the material may not be valid or may not have the necessary authorizations.
- Plant-Specific Settings: There may be issues with the plant-specific settings for the material, such as the plant not being set up correctly in the system.
- Data Inconsistencies: There could be inconsistencies in the master data, such as the material master or the MRP controller master data.
- Locked or Inactive Data: The material or MRP controller may be locked or inactive, preventing the re-evaluation process from completing.
Solution:
- Check Material Master Data: Verify that the material master data is complete and correct. Ensure that the MRP type, lot size, and other relevant fields are filled out properly.
- Validate MRP Controller: Ensure that the MRP controller assigned to the material is valid and has the necessary authorizations. You can check this in the MRP controller master data.
- Review Plant Settings: Check the plant settings for the material to ensure that the plant is correctly configured and that the material is assigned to the correct plant.
- Data Consistency Check: Run consistency checks on the material master and MRP controller data to identify any discrepancies or issues.
- Unlock or Activate Data: If the material or MRP controller is locked or inactive, take the necessary steps to unlock or activate it.
- Re-run MRP: After making the necessary corrections, re-run the MRP process to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
PR029
No re-evaluation record for MRP controller & for this choice
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PR028
Enter MRP controllers
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PR031
Replenishment lead time is greater than 999 days (check this)
What causes this issue? The replenishment lead time calculated by the system exceeds 999 days. The replenishment lead time is calculated as follows: ...
PR032
Preparation canceled after & runs (check the selection)
What causes this issue? There are too many objects which correspond to the entered selection criteria.System Response The system terminated the proc...