How To Fix PPH_MRP412 - Lead Time Scheduling and Capacity Planning


PPH_MRP412 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 412

  • Message text: Lead Time Scheduling and Capacity Planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_MRP412 - Lead Time Scheduling and Capacity Planning ?
    The SAP error message PPH_MRP412 typically relates to issues in lead time scheduling and capacity planning within the Production Planning (PP) module. This error can occur during the Material Requirements Planning (MRP) process when there are inconsistencies or issues with the data related to lead times, capacity, or scheduling.
    
    Cause: Inconsistent Lead Times: The lead times defined for materials or operations may not be consistent or may not match the production process. Capacity Constraints: There may be insufficient capacity available in the work centers to meet the planned production requirements. Incorrect Master Data: Issues with master data such as material master, routing, or work center data can lead to this error. Scheduling Parameters: Incorrect settings in scheduling parameters can lead to conflicts in the planning process. Missing or Incorrect Production Versions: If the production version is not correctly defined or is missing, it can lead to scheduling issues.
    Solution: Check Lead Times: Review and ensure that the lead

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker