Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 411
Message text: Determination of Basic Dates for Planned Orders
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP411
- Determination of Basic Dates for Planned Orders ?The SAP error message PPH_MRP411, which pertains to the determination of basic dates for planned orders, typically indicates that there is an issue with the scheduling or date determination process in the Material Requirements Planning (MRP) module. This error can arise due to various reasons, including configuration issues, missing data, or incorrect settings in the material master or production planning parameters.
Causes of PPH_MRP411
Missing or Incorrect Master Data: The material master data may be incomplete or incorrectly configured. This includes missing lead times, production versions, or other relevant data.
Scheduling Parameters: The scheduling parameters for the material may not be set correctly. This includes settings for in-house production time, planned delivery time, and other related parameters.
Capacity Constraints: If there are capacity constraints in the production resources, the system may not be able to determine the basic dates for planned orders.
MRP Type Settings: The MRP type assigned to the material may not be appropriate for the planning scenario, leading to issues in date determination.
Production Versions: If the production version is not maintained or is incorrect, it can lead to problems in determining the basic dates.
Solutions to PPH_MRP411
Check Material Master Data: Review the material master data for the affected material. Ensure that all relevant fields, such as lead times, production versions, and MRP parameters, are correctly filled out.
Review Scheduling Parameters: Verify the scheduling parameters in the material master. Ensure that the in-house production time and planned delivery time are set correctly.
Analyze Capacity Planning: Check the capacity planning for the production resources. Ensure that there are no capacity constraints that would prevent the scheduling of planned orders.
Verify MRP Type: Ensure that the MRP type assigned to the material is appropriate for the planning scenario. If necessary, change the MRP type to one that is more suitable.
Check Production Versions: Ensure that the production version is maintained correctly for the material. If there are multiple production versions, ensure that the correct one is being used.
Run MRP Again: After making the necessary corrections, run the MRP process again to see if the error persists.
Related Information
By following these steps, you should be able to identify and resolve the underlying issues causing the PPH_MRP411 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP410
BOM components: &1, stock transfer materials: &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP409
Scope: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP412
Lead Time Scheduling and Capacity Planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP413
MRP Live on Hana cannot read requirements from LiveCache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...