How To Fix PPH_MRP247 - Reord.Point w/ Ext.Req and Repl to Max Stock is not supported in MRP Live


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 247

  • Message text: Reord.Point w/ Ext.Req and Repl to Max Stock is not supported in MRP Live

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_MRP247 - Reord.Point w/ Ext.Req and Repl to Max Stock is not supported in MRP Live ?

    The SAP error message PPH_MRP247 indicates that there is an issue with the configuration of the reorder point planning in the context of MRP Live. Specifically, it states that "Reorder Point with External Requirements and Replenishment to Maximum Stock is not supported in MRP Live." This error typically arises when the system encounters a scenario that MRP Live does not support.

    Cause:

    The error is caused by the following conditions:

    1. Reorder Point Planning: The material is set up for reorder point planning, which is a method of inventory management where stock is replenished when it falls below a certain level.
    2. External Requirements: The material has external requirements (e.g., sales orders, forecasts) that are influencing the planning.
    3. Replenishment to Maximum Stock: The configuration is set to replenish stock up to a maximum level, which is not supported in MRP Live.

    Solution:

    To resolve this error, you can consider the following approaches:

    1. Change Planning Strategy:

      • If possible, change the planning strategy for the material to one that is compatible with MRP Live. For example, consider using consumption-based planning without external requirements or a different strategy that does not involve replenishment to maximum stock.
    2. Use Classic MRP:

      • If the business process requires the use of reorder point planning with external requirements and replenishment to maximum stock, you may need to switch back to classic MRP instead of MRP Live for this specific material.
    3. Adjust Material Master Settings:

      • Review the material master settings for the affected material. Check the MRP views and ensure that the settings align with the capabilities of MRP Live. You may need to adjust the reorder point, maximum stock level, or other relevant parameters.
    4. Consult Documentation:

      • Review SAP documentation or notes related to MRP Live and the specific error message. SAP may provide additional guidance or updates that could help resolve the issue.
    5. SAP Support:

      • If the issue persists, consider reaching out to SAP support for assistance. They can provide insights based on the specific configuration and requirements of your system.

    Related Information:

    • MRP Live: MRP Live is a more efficient and faster planning tool introduced in SAP S/4HANA, which processes MRP runs in a different way compared to classic MRP.
    • Planning Strategies: Familiarize yourself with different planning strategies available in SAP, as they dictate how materials are planned and managed.
    • Material Master: Understanding the material master data and its configuration is crucial for effective inventory management and MRP processes.

    By addressing the configuration and planning strategy, you should be able to resolve the error and ensure that your MRP processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant