Message type: E = Error
Message class: PPH_MRP -
Message number: 167
Message text: Lot-sizing procedure with end of short-term horizon in days not supported
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP167
- Lot-sizing procedure with end of short-term horizon in days not supported ?The SAP error message PPH_MRP167 indicates that there is an issue with the lot-sizing procedure in the context of Material Requirements Planning (MRP). Specifically, it suggests that the lot-sizing procedure you are trying to use is not supported when the end of the short-term horizon is defined in days.
Cause:
This error typically arises due to the following reasons:
Lot Sizing Procedure: The lot-sizing procedure you are using may not be compatible with the settings for the short-term horizon. Some lot-sizing procedures require specific configurations that are not met in your current setup.
Configuration Settings: The configuration for the MRP settings may not be aligned with the requirements of the lot-sizing procedure. This can include settings related to the planning horizon, lot size, or other MRP parameters.
Planning Parameters: The parameters defined for the planning run (like the short-term horizon) may not be appropriate for the selected lot-sizing procedure.
Solution:
To resolve this error, you can take the following steps:
Check Lot Sizing Procedure: Review the lot-sizing procedure assigned to the material in question. Ensure that it is appropriate for the planning scenario you are working with.
Adjust Short-Term Horizon: If possible, adjust the short-term horizon settings in the MRP configuration. You may need to set it to a value that is compatible with the lot-sizing procedure.
Review MRP Configuration: Go to the MRP configuration settings in SAP (transaction code SPRO) and check the following:
- MRP parameters for the material.
- Lot-sizing settings.
- Planning horizon settings.
Consult Documentation: Refer to SAP documentation or help resources for specific details on the lot-sizing procedures and their requirements. This can provide insights into which procedures are compatible with your current settings.
Testing: After making changes, run a test MRP run to see if the error persists. Monitor the results to ensure that the changes have resolved the issue.
Seek Help from SAP Support: If the issue continues, consider reaching out to SAP support or consulting with an SAP expert who can provide more tailored assistance based on your specific configuration and requirements.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP166
Period lot sizes according to posting periods not supported in MRP Live
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP165
Optimum lot-sizing procedure not supported by MRP Live on SAP HANA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP168
Period lot sizes only supported for one period
What causes this issue? Your Customizing settings for lot sizing have been configured in such a way that the requirements of several days, weeks, or ...
PPH_MRP169
Classic MRP with error &1(&2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.