Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: PPH_MRP -
Message number: 018
Message text: Planning run for material &1 in plant &2 has already been started
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP018
- Planning run for material &1 in plant &2 has already been started ?The SAP error message PPH_MRP018 indicates that a planning run for a specific material in a particular plant has already been initiated. This error typically occurs in the context of Material Requirements Planning (MRP) when a user attempts to start a new planning run for a material that is already being processed.
Cause:
- Concurrent Planning Runs: The most common cause of this error is that a planning run for the specified material and plant is already in progress. SAP does not allow multiple planning runs for the same material and plant to avoid data inconsistencies.
- Long-Running Processes: If a previous planning run is taking longer than expected, it may still be active when a new planning run is attempted.
- System Locking: The system may have a lock on the material due to ongoing processes or transactions that are preventing a new planning run from being initiated.
Solution:
- Check Active Planning Runs: Use transaction codes like
MD04
(Stock/Requirements List) orMD05
(MRP List) to check if there is an active planning run for the material in question. You can also check the job overview using transactionSM37
to see if there are any background jobs related to MRP that are still running.- Wait for Completion: If a planning run is currently in progress, you may need to wait for it to complete before starting a new one.
- Terminate Long-Running Jobs: If you find that a planning run is stuck or taking too long, you may need to terminate the job using transaction
SM37
. Be cautious with this approach, as terminating a job can lead to data inconsistencies.- Review Job Scheduling: If this issue occurs frequently, consider reviewing the scheduling of MRP runs to ensure they do not overlap.
- Consult with Basis Team: If you suspect that the issue is related to system performance or locking, consult with your SAP Basis team to investigate further.
Related Information:
MD01
(MRP Run), MD02
(MRP Run for Single Material), MD04
, MD05
, and SM37
.By following these steps, you should be able to resolve the PPH_MRP018 error and successfully manage your MRP planning runs.
Get instant SAP help. Sign up for our Free Essentials Plan.
PPH_MRP017
Reasons why materials are not planned using MRP Live on HANA
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP016
Runtime for MRP Live on HANA: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP019
MRP run terminated (help for analysis in note 2432291)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP020
Materials planned: &1 (classic MRP) &2 (MRP Live on HANA)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.