How To Fix PPH_MRP017 - Reasons why materials are not planned using MRP Live on HANA


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 017

  • Message text: Reasons why materials are not planned using MRP Live on HANA

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_MRP017 - Reasons why materials are not planned using MRP Live on HANA ?

    The SAP error message PPH_MRP017 indicates that certain materials are not being planned using MRP Live on HANA. This can occur for various reasons, and understanding the cause is essential for resolving the issue. Below are some common causes, potential solutions, and related information regarding this error message.

    Causes of PPH_MRP017

    1. Material Status: The material may have a status that prevents it from being planned. For example, if the material is blocked for planning or has a status that restricts its use in MRP.

    2. MRP Type: The MRP type assigned to the material may not be compatible with MRP Live. For instance, materials with certain MRP types (like "ND" for no planning) will not be included in MRP Live.

    3. Planning File Entry: The planning file entry for the material may not exist or may have been deleted. MRP Live relies on planning file entries to determine which materials need to be planned.

    4. MRP Group Settings: The MRP group assigned to the material may have settings that exclude it from MRP Live processing.

    5. Lot Size Settings: If the lot size settings are not appropriate, it may lead to the material being excluded from planning.

    6. Special Procurement Types: Materials with special procurement types (like external procurement) may not be planned in the same way as standard materials.

    7. Customizing Settings: There may be specific customizing settings in the system that affect how materials are planned.

    Solutions

    1. Check Material Status: Review the material status in the material master (MM02) and ensure it is set to allow planning.

    2. Review MRP Type: Verify the MRP type assigned to the material. If it is set to a type that does not allow planning, consider changing it to a suitable MRP type.

    3. Check Planning File Entry: Use transaction code MD21 to check the planning file entries for the material. If the entry is missing, you may need to run MRP for the material to create it.

    4. Examine MRP Group Settings: Review the settings for the MRP group assigned to the material. Ensure that it is configured to allow MRP Live processing.

    5. Adjust Lot Size Settings: Check the lot size settings in the material master and adjust them if necessary to ensure they are appropriate for MRP Live.

    6. Review Special Procurement Types: If the material has a special procurement type, ensure that it is set up correctly and that it aligns with your planning strategy.

    7. Consult Customizing Settings: Review the customizing settings related to MRP Live in the SPRO transaction. Ensure that all necessary configurations are in place.

    Related Information

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD01 (MRP), MD02 (MRP for single item), and MD21 (Display Planning File Entries) for troubleshooting.

    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to MRP Live and the error message PPH_MRP017.

    • Documentation: Refer to SAP Help documentation for MRP Live on HANA for detailed information on configuration and troubleshooting.

    • Testing: After making changes, always test the MRP run to ensure that the materials are now being planned as expected.

    By systematically checking these areas, you should be able to identify the cause of the PPH_MRP017 error and implement the appropriate solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker