How To Fix PPH_MRP005 - Total time required for splitting work sets: &1


PPH_MRP005 - Overview

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 005

  • Message text: Total time required for splitting work sets: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


PPH_MRP005 - Details

  • The SAP error message PPH_MRP005, which states "Total time required for splitting work sets: &1," typically occurs in the context of Production Planning and Control (PP) when the system is attempting to split work sets during the planning process. This error can arise due to various reasons related to the configuration of the system, the data being processed, or the specific settings in the planning run.
    Causes:
    
    Excessive Time Requirement: The error indicates that the total time required for splitting work sets exceeds a predefined limit. This can happen if the work sets are too large or complex.
    
    Configuration Issues: There may be configuration settings in the MRP (Material Requirements Planning) or PP module that are not optimized for the current workload. Data Issues: Inconsistent or incorrect data in the master data (like BOMs, routing, or work center data) can lead to complications during the planning process. System Performance: If the system is under heavy

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


PPH_MRP005 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author