Do you have any question about this error?
Message type: E = Error
Message class: PPH_MRP -
Message number: 003
Message text: Total time required for MRP Live on HANA: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPH_MRP003
- Total time required for MRP Live on HANA: &1 ?The SAP error message PPH_MRP003, which states "Total time required for MRP Live on HANA: &1," typically indicates that the execution time for the MRP (Material Requirements Planning) Live process is exceeding the expected limits. This can happen for various reasons, and addressing it involves both understanding the cause and implementing appropriate solutions.
Causes:
- Large Data Volume: The MRP run may be processing a large volume of materials or production orders, leading to longer execution times.
- Inefficient MRP Parameters: Incorrect or suboptimal MRP parameters can lead to inefficient planning runs.
- System Performance Issues: The HANA database may be experiencing performance issues due to hardware limitations, insufficient memory, or other resource constraints.
- Custom Code or Enhancements: Custom ABAP code or enhancements that are executed during the MRP run may be causing delays.
- Lock Contention: High levels of database locking can slow down the MRP process.
- Background Jobs: Other background jobs running concurrently may be consuming system resources.
Solutions:
- Optimize MRP Parameters: Review and optimize the MRP parameters in the configuration settings. Ensure that the planning horizon and other settings are appropriate for your business needs.
- Data Volume Management: If possible, limit the number of materials or production orders being processed in a single MRP run. You can segment the MRP runs based on material groups or other criteria.
- Performance Tuning: Analyze the performance of the HANA database. This may involve checking for hardware bottlenecks, optimizing database indexes, or adjusting memory settings.
- Review Custom Code: If there are custom enhancements or code that run during MRP, review them for efficiency. Consider optimizing or refactoring the code.
- Monitor System Load: Use transaction codes like ST03N or ST04 to monitor system performance and identify any resource-intensive processes that may be affecting MRP.
- Schedule Jobs Appropriately: If there are other background jobs running, consider scheduling them during off-peak hours to reduce contention for resources.
- Increase Timeout Settings: If the execution time is expected to be long due to legitimate reasons, consider increasing the timeout settings for the MRP process.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you should be able to mitigate the PPH_MRP003 error and improve the performance of your MRP Live processes on HANA.
Get instant SAP help. Start your 7-day free trial now.
PPH_MRP002
Number range not maintained for EBAN
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP001
SQL exception &1 occured: &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP004
Total time required for classic MRP: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPH_MRP005
Total time required for splitting work sets: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.